To-Do: Difference between revisions

From Unallocated Space
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
* Scrap bin part down
* Scrap bin part down
* Organize storage area
* Organize storage area
* Alter the layout of the UberLoft
* Create caretaker list of stuffs
* Sort Books
* Mop main-room floor
* Decide the fate of the vending machine
* Replace batteries in the ceiling fan remotes
* Add patch panels under the loft
* Build [[NERF]] rack
* Build [[NERF]] rack

Revision as of 14:48, 18 June 2012

This list will be modified as needed.

  • Scrap bin part down
  • Organize storage area
  • Build NERF rack